All Categories

PRODUCTS

Home /  Products

Chlorinated rubber topcoat

  • Overview
  • Recommended Products

Basic parameters

Color Various colors

Proportioning Single components

Construction brush, spray, roll coating can be applied

The composition is composed of chlorinated rubber resin, titanium dioxide, anti-rust pigments, fillers, additives, solvents and so on.

未标题-1_01.gif

Product characteristics

Construction is convenient. Chlorinated rubber coatings can be constructed in an environment of -20 to 50 ° C, regardless of season and temperature restrictions. It usually adopts a single can packaging system, does not need to temporarily deploy other components at the construction site, and can be used after opening the package and stirring evenly.

Quick drying. The chlorinated rubber paint is dried by solvent volatilization, drying quickly, and the second coating can be applied after 4 to 6 hours at room temperature.

Excellent adhesion. Chlorinated rubber coating has good adhesion to the surface of iron and steel metal, and at the same time, between the coating and the coating due to the solvent in the film-forming substance can play the role of infiltration, so that the lower layer is bonded to each other, thus strengthening the adhesion between the coating film.

Corrosion-proof. Chlorinated rubber itself is a chemically inert film-forming substance, the permeability of the film to water vapor and oxygen is very low, only 1/10 of the alkyd, and it has good resistance to water, salts, acids, alkalis, oxidants, and various corrosive gases.

Technical requirements

未标题-1_02.gif

Product use

Widely used in ships, port facilities, Bridges, containers, chemical equipment and concrete anticorrosion protection.

Construction parameters

未标题-1_04.gif未标题-1_05.gif

Construction structure drawing:

未标题-1_07.gif

Supporting scheme:

Chlorinated rubber primer/epoxy zinc-rich primer/Inorganic zinc-rich primer/cold spray zinc primer/graphene zinc powder primer/epoxy iron red primer + chlorinated rubber intermediate paint/epoxy cloud iron intermediate paint/epoxy thick paste intermediate paint + chlorinated rubber top paint

Construction precautions:

In the high temperature season construction, easy to occur dry spray, in order to avoid dry spray can be adjusted to do not spray until the diluent.

This product should be used by professional painting operators according to the product packaging or the instructions in this manual.

Steel surface:

It is necessary to thoroughly remove oil and rust, etc., to achieve the rust removal standard Sa2.5, and the roughness reaches 30um-75um; Adopt manual rust removal method, need to reach the rust removal standard St3 level.

Concrete surface:

Concrete surface should be flat, dry, no seepage floating and water. The base that has been polluted by grease and chemicals can be washed with detergent, lye or solvent, and can also be treated by fire baking, steam blowing, etc., but it must not damage the base.

Precautions

Products should be stored in a cool and ventilated place to prevent rain, direct sunlight, avoid collision, need to isolate the fire source.

The construction site is strictly prohibited fireworks, painters should wear glasses, gloves, masks, etc., to avoid skin contact and inhalation of paint mist.

All work of coating and use of this product must be carried out in accordance with various relevant national health, safety and environmental protection regulations and standards.

If you have any questions about the use of this product, please contact our technical service department.

未标题-1_08.gif未标题-1_09.gif未标题-1_11.gif

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000
Email Email WhatApp WhatApp Top Top
Professional, Ultimate service
Get the latest information on our products solutions that meet your needs